Milestone 4 achieved: Membrane scaling-up and optimisation | Aug 2022

Involved partners:
CNR-ITAE, CNRS, HydroLite, IRD

Date of achievement:
31 Aug 2022 (M32).

Summary:
Anion exchange membrane provision for large-area MEAs has been accomplished.  The selected membrane, activated according to an exchange procedure developed at CNR-ITAE, and validated in a 3000h cumulative test showing required series resistance, was provided to IRD for large-area MEA manufacturing.

The results are documented in D3.3, D4.1, D5.2, and in a publication in Electrochimica Acta (413, 2022, 140078).